Intermediate Pipe Replacement for Buick Park Avenue 1998
Removal Procedure
Tools Required
J 29800 Cut-Off Tool
Important: A service muffler is required when replacing the intermediate pipe/resonator
on an originally equipped welded system.
- Support the catalytic converter.
- Cut the pipe (1) at the
muffler using J 29800
cut off
tool.
- Remove the muffler.
- Cut the pipe (1) at the
front of the resonator.
- Remove the resonator and intermediate pipe.
Installation Procedure
- Install the resonator
with the guillotine clamps. Position the clamps so the nuts are towards the
drivers side of the vehicle.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Align the exhaust
system for proper clearance and then tighten the clamps.
Tighten
Tighten the clamp nuts to 40 N·m (30 lb ft).
- Install the muffler and hangers.
- Install the pipe to the muffler using a U-bolt type clamp. Position
the clamp on drivers side muffler so the nuts are towards the drivers side
of the vehicle. Position the clamp on the passengers side muffler so the nuts
are toward the passenger side of the vehicle.
- Align the muffler and the intermediate pipe and resonator assembly
to proper clearance.
Tighten
Tighten the clamp nuts to 40 N·m (30 lb ft).